Flare & Combustion Systems for Gas Processing Facilities
NGL fractionation plants, glycol dehydrators, amine treating units, and compressor stations require combustion equipment engineered for rich hydrocarbon streams, BTEX vent gas, and sour gas service.
What Makes Gas Processing Combustion Different
Each gas processing vent source (dehydrator stacks, NGL relief headers, amine regenerators, compressor blowdowns) has its own stream composition, BTU content, and permit requirement.
BTEX in Glycol Dehydrator Vents
TEG dehydrator still column vents concentrate benzene, toluene, ethylbenzene, and xylenes — all listed HAPs regulated under Subpart HH. Standard flare tips smoke on BTEX-rich streams and fail DRE requirements.
Rich Hydrocarbon Streams from NGL Plants
NGL fractionation plant relief vents carry high-molecular-weight fractions (propane, butanes, pentanes) with high smoking tendency. Flare tip sizing must follow API RP 521 for high-MW streams, not standard gas assumptions.
Sour Gas from Amine Treating Units
Acid gas vent streams from amine regenerators carry H2S and CO2 with low BTU content that requires supplemental fuel for stable combustion. Flameout events produce SO2 odor and downwind hazards.
Variable Flow at Compressor Stations
Compressor station blowdown and relief vent flows vary widely between normal operations and emergency events. Equipment must handle peak blowdown rate without flame instability or structural overload.
Remote Location and Minimal Utilities
Many gas processing and midstream facilities are in remote locations with no instrument air, no steam utility, and limited electrical power. Combustion equipment must operate unattended on minimal infrastructure.
Combustion Systems for Gas Processing
Purpose-built for midstream oil and gas, from glycol dehydrator BTEX control to NGL plant relief headers and compressor station blowdown.
Air-Assist Flares & BTEX Combustors
Air-assist combustors and flare tips for glycol dehydrator still column vent gas. Sized to actual BTEX vent stream composition with 95% or 98% HAP DRE. No steam utilities required.
Sonic Flares
Pressure-assisted sonic flare tips for NGL fractionation plant relief headers and compressor station blowdown where high-pressure, high-velocity streams exceed conventional elevated tip limits.
Enclosed Combustors
For storage vessel vent streams, pump seal vents, and small process vent streams at gas processing plants where a permit requires no visible flame and DRE documentation.
Key Standards for Gas Processing Combustion Equipment
| Standard | Applicability | Key Requirement | HPS Products | Status |
|---|---|---|---|---|
| 40 CFR Part 63, Subpart HH NESHAP: Oil & Gas Production |
Storage vessels and glycol dehydrators at oil and natural gas production facilities with major or area source HAP emissions above thresholds. | 95% HAP reduction or outlet below 20 ppmv; dehydrator vent gas must be routed to a combustion device meeting Subpart HH performance requirements. | Air-Assist Flares, BTEX Combustors | COMPLIANT |
| 40 CFR Part 63, Subpart HHH NESHAP: Natural Gas Transmission |
Glycol dehydrators at natural gas transmission, distribution, and storage facilities with major source HAP emissions above applicable thresholds. | 95% HAP reduction; dehydration unit vent gas routed to control device; no emissions averaging allowed. | Air-Assist Flares, Enclosed Combustors | COMPLIANT |
| EPA 40 CFR Part 60, Subpart OOOOb NSPS: Oil & Gas (after Dec 6, 2022) |
New, modified, and reconstructed storage vessels, compressor wet seals, and other sources at gas processing plants affected after December 6, 2022. | 95% or 98% VOC/HAP reduction depending on source type; combustion device performance monitoring and recordkeeping required. | Enclosed Combustors, Air-Assist Flares | COMPLIANT |
| 40 CFR 60.18(c) General Combustion Device Standards |
All flares and combustion devices used to comply with any NSPS or NESHAP rule at gas processing facilities. | Net heating value at or above 300 BTU/scf; continuous pilot; no visible emissions except in specified circumstances. | All HPS combustion products | COMPLIANT |
| State Air Permits Title V / Minor Source Permits |
Facility-specific permit conditions that may set operating parameter limits, monitoring requirements, and DRE minimums above federal thresholds. | Varies; HPS documentation supports permit application and permit compliance recordkeeping. | All products | SITE-SPECIFIC |
Technical Questions on Gas Processing Combustion Systems
What DRE is required for a glycol dehydrator combustor under Subpart HH?
Can one combustor handle multiple dehydrator still column vents at one facility?
Our acid gas from the amine regenerator has very low BTU content. Can you combust it?
What H2S levels require special materials in the combustion device?
Does OOOOb apply to storage vessels at our gas processing plant?
What lead time should we plan for a BTEX combustor replacement?
Gas processing vent streams are not natural gas. A glycol dehydrator still column vent is a BTEX-rich mixture that will smoke on a standard flare tip and fail its DRE requirement within the first inspection period.
Craig Rosencutter, President, Hero Process SolutionsTechnical Reference for Gas Processing Applications
Combustor & Flare Spec Sheets
Dimensional and performance data for HPS air-assist combustors, sonic flares, and enclosed combustors for gas processing service.
↓ View All DatasheetsAir-Assist Flares & BTEX Combustors
BTEX-rated combustion systems for glycol dehydrator and amine treating unit vent streams. Subpart HH / HHH compliant.
→ View ProductsSonic Flares for NGL & Compressor Service
Pressure-assisted sonic tips for NGL plant relief headers and compressor station blowdown. API RP 521 / 537 designed.
→ View ProductsEnclosed Vapor Combustors
No-visible-flame control for storage vessel vent streams and small process vents. OOOOb-certified with monitoring plan.
→ View ProductSubpart HH / HHH / OOOOb Compliance Guide
HAP control requirements for glycol dehydrators, storage vessels, and compressor wet seals at gas processing facilities.
→ Read GuideTalk to an HPS Engineer
Send us your vent stream composition, flow rate, and permit conditions. We confirm equipment type and lead time within 48 hours.
→ Contact UsGas Processing Combustion Equipment Quote
Send us your vent stream composition, flow rate, operating pressure, and permit requirements. We confirm equipment type and DRE compliance basis within 48 hours.
- ✓ BTEX combustor and air-assist flare sizing
- ✓ HAP DRE compliance documentation included
- ✓ Sour gas alloy selection for H2S service
- ✓ Sonic flare sizing for high-pressure blowdown
Need datasheets first?
↓ View All HPS Datasheets →Ready to Specify Your Gas Processing Combustion System?
Send us your vent stream composition, flow rate, and permit conditions. We confirm equipment type and lead time within 48 hours.
Hero Process Solutions, 14842 Maple Dr, Kellyville, OK 74039

